"Agency of Independent Technical Supervision" LLP has been working in the engineering services market since 2011. During this time, we have been participating in the construction of a large number of civil and industrial facilities of 500 to 100,000 square meters. We treat each of the objects very responsibly. Our company is a team of professional like-minded people.

We participated in the construction of a large number of facilities, many of which are unique, among them there is a large of 60,000 sq.m. and small of 500 sq.m., but during the construction, we treat everyone equally responsibly regardless of size.

We have a unique, close-knit team with vast experience, responsibly suitable and loving professionals.

Our experience will be very useful to you.

We are young, smart, energetic - we are able and we want to work !!!!!!

Our clients

Reviews

Covering letter

Hereby, "Agency of Independent Technical Inspection" LLP (AITI) expresses its respect to you and informs you that due to recent changes in the legislation of the Republic of Kazakhstan, IE Titov has been transformed into a company "Agency of Independent Technical Inspection" LLP (AITI).

According to your request, we present the following information:

Industrial facilities where our Company worked:

  1. Pharmaceutical Plant of JV AbdiIbrakhimGlobalPharm Kazakhstan-Turkey LLP.

    Adress: Almaty region, Ashibulak rural district, Ili district.
    General contractor: MAGNET LLC, Moscow.
    Total area of the building: 11000 sq.m.
    Additional infrastructure: Steam boiler room, heating boiler room, emergency diesel generators, diesel fuel tanks, water well (main water supply), transformer substations.
    Work performed: Technical supervision on load-bearing enclosures (expert Titov S.A.), on engineering networks (expert Denisov A.I.), on technological equipment (expert Dedovich A.V.).
    Constructive proposal: reinforced concrete foundations, frame of metal structures of 250 tons. Sheathing of sandwich panel external walls, internal partitions of foam blocks.
    Construction period: 3 years
    __________________________________________________________________

  2. Factory for foam blocks production "BerlikStroi" LLP Kazakhstan

    Address: Almaty region, "Vodnik-3" Microdistrict
    General contractor: "BerlikStroi" LLP, Almaty
    Total area of the building: 8 000 sq.m.
    Additional infrastructure: Steam boiler room, repair shops, central water supply, emergency diesel generators, transformer substation
    Work performed: Technical supervision on load-bearing enclosures (expert Titov S.A.), on engineering networks (expert Denisov A.I.), on technological equipment (expert Dedovich A.V.).
    Constructive proposal: reinforced concrete foundations, frame of metal structures of 185 tonsexternal walls of foam blocks, internal partitions of foam blocks.
    Construction period: 2 years
    __________________________________________________________________

  3. Logistic center "Astana Contract"

    Address: Almaty region
    General contractor: "Astana Contract"LLP
    Total area of the building: 55 000 sq.m.
    Additional infrastructure: heating boiler room, emergency diesel generators, diesel fuel tanks, water well (main water supply), transformer substations.
    Work performed: Author's supervision (expert Dedovich A.V.).
    Constructive proposal: reinforced concrete foundations, frame of metal structures of 1250 tons, sandwich panels exterior walls, sandwich panel internal walls.
    Construction period: 2 years
    __________________________________________________________________

  4. Almaty Hyundai Center

    Address: Almaty, Alfarabi Street.
    General contractor: «Bi Grup»JSC Astana
    Total area of the building: 5 000 sq.m.
    Additional infrastructure: repair shops, central water supply, emergency diesel generators, transformer substation
    Work performed: Technical supervision on load-bearing enclosures (expert Titov S.A.), on engineering networks (expert Denisov A.I.), on technological equipment (expert Dedovich A.V.).
    Constructive proposal: reinforced concrete foundations, frame of metal structures of 150 tons, sandwich panels exterior walls, internal partitions of bricks, in the world practice the first facade cladding with aluminum sheets with anodized coating in 3D-assembly. (in China, similar cladding has been replaced with alucobond due to the complexity of the installation)
    Construction period: 2 years
    __________________________________________________________________

  5. BMW Center

    Address: Almaty, Alfarabi Street.
    General contractor: «Bi Grup»JSC Astana
    Total area of the building:4 000 sq.m.
    Additional infrastructure: repair shops, central water supply, emergency diesel generators, transformer substation
    Work performed: Technical supervision on load-bearing enclosures (expert Titov S.A.), on engineering networks (expert Denisov A.I.), on technological equipment (expert Dedovich A.V.).
    Constructive proposal: reinforced concrete foundations, frame of metal structures of 130 tons, sandwich panels exterior walls, internal partitions of bricks.
    Construction period: 2 years
    __________________________________________________________________

We participated in the construction of a large number of facilities, many of which are unique, among them there is a large of 60,000 sq.m. and small of 500 sq.m., but during the construction, we treat everyone equally responsibly regardless of size.

We have a unique, close-knit team with vast experience, responsibly suitable and loving professionals.

Our experience will be very useful to you.

Certificate of accreditation

Our contacts

City: +7 727 317-59-11

Director: +7 707 480-44-50

Technical Support: +7 708 331-64-20

Email: info@antnadzor.kz

Our address: 213 Of., 61/1, Markov Str., c. Almaty
       2nd floor, "Garant" Business Centre, 1st Block

окна фотограф html php памятники знакомства